Additions were constructed to the existing High School/Junior High; a 16,000 sq foot gymnasium and locker room facility and a two story, 20,000 sf classroom wing. Some renovations also were required in the existing 120,000 sq foot building. The project also included replacement of the underground fuel tanks for the buses and installation of a sprinkler water holding tank and fire pump to provide sprinkler for the building.

  • Location: Catawissa, PA