RLC Computer Room Renovations:  Interior renovations to the 1,800 sq. ft. campus central data center, including: new redundant HVAC systems, new clean agent suppression system, access flooring replacement, and separation of critical equipment space from occupied spaces to create a dedicated environment for the electronic equipment.

Zimmerli Gymnasium Pool Filtration System Replacement: Analysis of various options to replace the existing vacuum DE filter system and preparation of bidding documents to replace the system with a regenerative media system. Work included new electric services, new pool water heater, and internal lining of original corroded pool drain piping.

  • Location: Lock Haven, PA