Complete design of mechanical systems for the 350,000 sq. ft. renovations and additions to existing High School.  HVAC system consisted of gas-fired hot water boilers and cooling system included centrifugal chillers with outdoor condensing units.  Electrical system included complete replacement of electrical distribution, new lighting and power to new equipment throughout building.  Project also included new telecommunication system and computer networking. 80 Million dollar renovations and additions project to the high school that included technical education classrooms such as a woodshop, print shop, and art rooms.

  • Location: East Stroudsburg, PA