Campus-wide Electrical Utility Upgrade: Prime Consultant for the Campus-wide Underground Electrical High Voltage Distribution System, including Transformers, High Voltage Switch Gear, Underground Cables, Dual Service High Voltage Switch House.  Construction Cost: $3.5m
Construct New Police Station Building Prime Consultant for this project.  Our services included preparation of contract documents for the Architectural, Plumbing, HVAC and Electrical used for competitive bidding and construction administration. Construction Cost: $500k
Henry Ahnert Alumni Center:  The design-build package included the mechanical and electrical construction.  Our services included preparation of contract documents for the new Plumbing, HVAC and Electrical Systems that were used for competitive bidding.  During the design process we worked with the Contractors selected to design the system within the project budget. Construction Cost: $1.1m
Koehler Fieldhouse Exterior Lighting New sports field lighting for the ESU Sports Complex.
Koehler Fieldhouse Second Floor Renovations:  Schematic Design for conversion of racquetball and squash courts to athletics department office suite
Laurel Residence Hall:  Renovations and upgrades to the existing plumbing, HVAC and electrical systems.  The work performed was strategically designed to be completed during the summer recess to not interfere with the students on Campus.
President Residence:  Replacement of steam heating system with baseboard hot water system, plus the addition of central air-conditioning to the 2-story residence.  
Stroud Hall:  Replacement of the existing cooling towers on the roof with a new cooling tower system. 
Rosenkrans Hall Conversion of darkrooms to computer lab.
University Bookstore Expansion:  Upgrade interior lighting, HVAC upgrade, MEP design and Construction Review to accommodate expansion of existing book store and food service area.
  • Location: East Stroudsburg, PA