North Campus Intermediate / High School:  Complete design of mechanical systems for the 400,000 sq. ft. school.  HVAC system consisted of (3) oil-fired hot water boilers and cooling system included centrifugal chillers with outdoor cooling tower.  Project also included new telecommunication system and computer networking.

North Campus High Voltage Distribution System: The entire high voltage distribution system on the Campus was upgraded and replaced with a new system.  This included the high voltage distribution equipment connected to the Power Company and new transformers and services to each building on Campus.

  • Location: Bushkill, PA